Atlantic Air
​​

​TEL: 028 8675 1025
​info@atlanticairtesting.com


Services

Commercial Ventilation Balance & Commissioning


Location

Belfast City Council, Adelaide Street, Belfast


Description

We were appointed to balance and commission the mechanical ventilation system in this new city centre office building. The £24.5m project will provide Belfast City Council with over 100,000 sq ft of modern, flexible accommodation.
.



Services
Commercial Ventilation Balance & Commissioning


Location
Bullitt Hotel, Belfast, Co. Antrim


Description

We were appointed to balance and commission the mechanical ventilation systems in this new city centre hotel. The hotel facilities included; 45 no. bedrooms, public bar, restaurant, reception area and rooftop beer garden. The ventilation systems included; 4 no. air handling units, 2 no. heat recovery units and 3 no. air conditioning units.


Services

Heat Recovery Ventilation & Air Tightness Testing

Location
Ballygawley, Co. Tyrone

Description
We were appointed to design, install and commission a Vent-Axia MVHR system in this two storey detached dwelling. We also provided air tightness testing and consultancy services to the client.
​The final air tightness test result was 1.27 m³/(hr*m²) @50 Pa.


Services
Commercial Heat Recovery Ventilation

Location
LCC Group, Cookstown, Co. Tyrone

Description
We were appointed to design, install and commission a commercial MVHR system in a new four storey (20,000 sqft) office block. In order to achieve the necessary airflows the new system includes 8 no. LG commercial MVHR units and approximately 600m of spiral and bespoke ductwork.


Services

Heat Recovery Ventilation & Air Tightness Testing


Location
Hillsborough, Co. Down


Description
We were appointed to design, install and commission the MVHR system in this new 5000 sq ft dwelling. The system included 2 no. Vent-Axia Sentinel Kinetic Plus MVHR units, Nuaire thermal ductwork throughout all non-conditioned areas and rigid PVC ductwork throughout the heated envelope. We also carried out air tightness testing, As Built SAP and EPC for the main contractor Doral Contracts.